Fartvs Antiqvvs
Following 14 weeks of Shielding, decided to motor down to the Tudor Arms at Slimbridge to test out the new order for dining there.

On approaching  Whitminster roundabout, there is great progress to be seen with the Canal Trust scheme to link the Stroud Water Canal, with Saul Junction and bridges spanning the newly dug out basin for same. I presume this will end at the West side of the M5 near junction 13 and that if Dale's Eco Park scheme is progressed, the job will be completed with his plan to install Locks down and up again under the M5?

PS. Very impressed with the Tudor Arms' risk assessment document, followed to the letter in the dining areas.
Non essere curioso!
Reply 0 0
TreeinWillsbridge
Canal volunteers preserved in canal preservation & restoration back in the day when Gov'n Policy was still to fill them in! So why wouldn't they succeed now, with a proven track record of success and possible lottery funding. A working or navigable canal brings tourists & money!
Reply 2 0
freddy
Well 3 years have passed since the last post on this subject, can anyone give us an idea of progress during the last 3 years? I understand a new railway bridge has been constructed which gives access to Ryeford from Eastington. How is the missing mile looking, still missing?
Reply 1 0
Les Richards Aberles
Still missing and progress is slow but steady. As you say the Ocean bridge is complete as is restoration of Pike and Blunder locks. Restoration under way for Newtown Lock and John Robinson lock. Next two big hurdles are the M5 underpass and Walkbridge. Then missing mile. Delays due to the pandemic, planning, supporting existing wildlife (water voles) and inflation. NHLF are still very supportive. My guess completion same time as the Eco stadium. It will be quicker if we had more volunteers or donations so why not consider it? 
Reply 2 0
michael
any idea when the M5 underpass works are likely to start ?
(i thought they were due last spring and government/GCC funded so not necessarily relying on canal trust money correct or fake news ?
 
once the river/canal is re routed under the motorway, it looks as though it takes a detour around the outskirts of the mysterious training ground complex which equally seems vert start stop,stop stop.
 
I forget-are you in knowledge-are FGR allegedly funding some  of the re routing around the training grouns once canal finds its wayy onto the mainland (east side of M5 ? 
Reply 1 0
Les Richards Aberles
Thanks for your interest. Not sure of the timetable but I gather specs are being drawn up, then out on tender for Walkbridge and the M5 underpass. The towpath will not follow the canal under the M5 as it uses the river underpass and there is insufficient width. The towpath will take a dog leg up to the low cattle underpass. The missing mile will not follow its original route as the FGR training grounds plans stopped that. When exiting John Robinson lock (legacy funding) the canal will turn through 90 degrees to the left as a result. Not aware of any funding from FGR unfortunately. Most of it comes from NHLF, authority grants, donations/legacies and income through CCT. Canal volunteers doing the missing mile, dredging, building towpaths (7Km), restoring locks, etc is saving many millions. Pay a visit to a CCT visitor shop or indeed look on the CCT website and you can see the plans. As a volunteer it’s the cheapest gym in the area. 😀
Reply 5 0
michael
Any ' movement ' on this ?
 
provisional updates and realistic timescales for commencement ?
 
will be great imo if / when it happens
Reply 0 0
Les Richards Aberles
Yes some movement I suggest you visit CCT website or go to a visitor centre.
Reply 0 0
LTL
[CCT-Phase-1B-Plan-1024x722]
Reply 4 0
Pitchfork
Thanks @LTL a useful map brings some clarity to the proposed canal development- hopefully the ‘missing mile’ will come to fruition. It will be a huge task even with modern machinery.
 
I’m always incredulous about how canals were built in the 19th century with just human muscle.
Reply 2 0
Pitchfork
And on the subject of communication, the reopening of the Stroudwater station would be timely - but this would be another major project when funding is tight.
 
Reply 3 0
michael
yes-that would be really good PF.
 
however in reality ,probably even less likely than 3 up/3 down to the EFL in the next 5 years ?
Reply 1 0
Les Richards Aberles
[CCT-Phase-1B-Plan-1024x722]
The canal volunteers are looking forward to the day that Dale allows access (again) to Westfield lock and the proposed aqueduct so we can crack on.
Reply 1 0
Reply